#130 Replace chip antenna part selection

Avoinna
4 vuotta sitten avasi Michael Schloh von Bennewitz · 0 kommenttia

Replace chip antenna part selection

Problem environment

The onboard (compact) antenna selection includes a chip antenna part with several unique alternative models.

Steps to reproduce

  1. Refer to the schematic
  2. Locate AE3 and AE5
  3. Test and replace antennas

Expected result

The final onboard antenna part choice is the best combination of price and performance available.

Actual result

It's unknown what the best combination of price and performance a onboard antenna part implies.

Resources

In addition to the Johanson 0868AT43A0020E consider other Pulse Larsen alternatives of similar size:

  • W3320
  • W3013
  • W3016
  • W3136
  • W3403
  • W3139
  • W3000
  • W3329

…or the AVX Ethertronics models:

  • M620720
  • 1002427
  • 1001011
  • LSP69001299TR

…or search several other manufacturers (for example Taoglas, Linx, etcetera.)

Severity level

This is low priority because project requirements do not mandate an antenna choice.

# Replace chip antenna part selection ## Problem environment The onboard (compact) antenna selection includes a chip antenna part with several unique alternative models. ## Steps to reproduce 1. Refer to the schematic 1. Locate AE3 and AE5 1. Test and replace antennas ## Expected result The final onboard antenna part choice is the best combination of price and performance available. ## Actual result It's unknown what the best combination of price and performance a onboard antenna part implies. ## Resources In addition to the Johanson 0868AT43A0020E consider other Pulse Larsen alternatives of similar size: * W3320 * W3013 * W3016 * W3136 * W3403 * W3139 * W3000 * W3329 …or the AVX Ethertronics models: * M620720 * 1002427 * 1001011 * LSP69001299TR …or search **several other manufacturers** (for example Taoglas, Linx, etcetera.) ## Severity level This is **low priority** because project requirements do not mandate an antenna choice.
Michael Schloh von Bennewitz added the
enhancement
label 4 vuotta sitten
Michael Schloh von Bennewitz added this to the Postproject catchall milestone 4 vuotta sitten
Sign in to join this conversation.
Ei merkkipaalua
No Assignees
1 osallistujaa
Due Date

No due date set.

Dependencies

This issue currently doesn't have any dependencies.

Loading…
Peruuta
Tallenna
Sisältöä ei vielä ole.