#15 Complete a draft design

Closed
opened 3 years ago by Michael Schloh von Bennewitz · 1 comments

Complete a draft design

Problem environment

Copper etching, tests of tooling, and prototype manufacturing require a complete schematic capture and test layout.

Steps to reproduce

  1. Seek a schematic
  2. Seek a layout
  3. Seek a etching

Expected result

All the steps needed to manufacture a early prototype should be complete.

Actual result

Work is in progress to complete the steps leading to a early prototype.

Severity level

This is high priority because project requirements state a generation of hardware engineering to be carried out.

# Complete a draft design ## Problem environment Copper etching, tests of tooling, and prototype manufacturing require a complete schematic capture and test layout. ## Steps to reproduce 1. Seek a schematic 2. Seek a layout 3. Seek a etching ## Expected result All the steps needed to manufacture a early prototype should be complete. ## Actual result Work is in progress to complete the steps leading to a early prototype. ## Severity level This is **high priority** because project requirements state a generation of hardware engineering to be carried out.
Michael Schloh von Bennewitz added this to the First generation hardware engineering milestone 3 years ago
Michael Schloh von Bennewitz added the
bug
label 3 years ago

Schematic capture for a Microchip integration (RF and serial) concludes in a88a134751.

Schematic capture for a Microchip integration (RF and serial) concludes in a88a134751.
Sign in to join this conversation.
No Assignees
1 Participants
Due Date

No due date set.

Dependencies

This issue currently doesn't have any dependencies.

Loading…
Cancel
Save
There is no content yet.