#173 EEPROM specification lacks a device tree fragment

已關閉
Michael Schloh von Bennewitz4 年之前建立 · 1 條評論

EEPROM specification lacks a device tree fragment

Problem environment

The HAT standard requires valid EEPROM data, but does not include a compiled device tree structure. Such a structure can help a new user avoid GPIO manipulation steps considered to be advanced.

Steps to reproduce

  1. Refer to the test plan
  2. Review programrom.txt
  3. Search for a device tree

Expected result

A device tree fragment is compiled together with programdat to create a comprehensive EEP file.

Actual result

There is no device tree fragment available.

Workaround

Producing a EEP file and programming it to the EEPROM results in a valid HAT configuration, even without a device tree fragment. The user must manually configure GPIOs in use (for example GPIO26 to programmatically reset the MCU) before writing to or reading from them.

Severity level

This is low priority because project requirements do not include EEPROM identification.

# EEPROM specification lacks a device tree fragment ## Problem environment The HAT standard requires valid EEPROM data, but does not include a compiled device tree structure. Such a structure can help a new user avoid GPIO manipulation steps considered to be advanced. ## Steps to reproduce 1. Refer to the test plan 1. Review programrom.txt 1. Search for a device tree ## Expected result A device tree fragment is compiled together with programdat to create a comprehensive EEP file. ## Actual result There is no device tree fragment available. ## Workaround Producing a EEP file and programming it to the EEPROM results in a valid HAT configuration, even without a device tree fragment. The user must manually configure GPIOs in use (for example GPIO26 to programmatically reset the MCU) before writing to or reading from them. ## Severity level This is **low priority** because project requirements do not include EEPROM identification.
Michael Schloh von Bennewitz added the
enhancement
label 4 年之前
Michael Schloh von Bennewitz added the
help wanted
label 4 年之前
Michael Schloh von Bennewitz 新增至Postproject catchall 里程碑 4 年之前

Solved in 0859e50.

Solved in 0859e50.
登入 才能加入這對話。
未選擇里程碑
No Assignees
1 參與者
Due Date

No due date set.

Dependencies

This issue currently doesn't have any dependencies.

Loading…
取消
儲存
尚未有任何內容