#25 Structure EPROM Data

Zamknięty
otworzone 4 lat temu przez Michael Schloh von Bennewitz · 2 komentarzy

Structure EPROM Data

Problem environment

Date for Hat interfaces must be structured according to a Raspberry Pi Foundation specification, and written to EPROMs with proper tools.

Steps to reproduce

  1. Connect a Dediprog
  2. Analyse EPROM storage
  3. Compare with specification

Expected result

The data structures conform with the Raspberry Pi Foundation hat specification.

Actual result

No data nor structure information exists.

Severity level

This is low priority because project requirements do not include EPROM data.

# Structure EPROM Data ## Problem environment Date for Hat interfaces must be structured according to a Raspberry Pi Foundation specification, and written to EPROMs with proper tools. ## Steps to reproduce 1. Connect a Dediprog 2. Analyse EPROM storage 3. Compare with specification ## Expected result The data structures conform with the Raspberry Pi Foundation hat specification. ## Actual result No data nor structure information exists. ## Severity level This is **low priority** because project requirements do not include EPROM data.
Michael Schloh von Bennewitz dodano etykietę
enhancement
4 lat temu
Michael Schloh von Bennewitz dodaje to do kamienia milowego Postproject catchall 4 lat temu
Michael Schloh von Bennewitz skomentował(-a) 4 lat temu
Właściciel
Resources include: * https://www.github.com/raspberrypi/hats/ * https://www.raspberrypi.org/blog/introducing-raspberry-pi-hats/ * https://hackaday.io/project/167888-not-quite-useless-raspberry-pi-replacement/log/170018-raspberry-pi-hat-id-eeprom-details/
Michael Schloh von Bennewitz skomentował(-a) 4 lat temu
Właściciel

Research and structure is completed according to the manufacturer reference in 4f9180b.

Research and structure is completed according to the [manufacturer reference](https://github.com/raspberrypi/hats/tree/master/eepromutils/) in 4f9180b.
Zaloguj się, aby dołączyć do tej rozmowy.
Brak kamienia milowego
Brak przypisanych
Uczestnicy 1
Termin realizacji

Brak ustawionego terminu realizacji.

Zależności

To zgłoszenie nie ma w tej chwili żadnych zależności.

Ładowanie…
Anuluj
Zapisz
Nie ma jeszcze treści.