#9 Test several antennas

Slēgta
Michael Schloh von Bennewitz atvēra pirms 4 gadiem · 1 komentāri

Test several antennas

Problem environment

Product models may benefit from one or more antenna connections, such as trace, SMA, U.FL, and chip types.

Steps to reproduce

  1. Observe the swtich design
  2. Find the antenna circuit
  3. Determine number and type of antenna

Expected result

One or more antennas are designed that correspond with application tradeoffs.

Actual result

Testing has not yielded information useful in deciding (lack of) antenna design.

Workaround

Include several antennas in the switch and antenna design until information leads to a better choice.

Severity level

This is low priority because project requirements state no antenna quality.

# Test several antennas ## Problem environment Product models may benefit from one or more antenna connections, such as trace, SMA, U.FL, and chip types. ## Steps to reproduce 1. Observe the swtich design 2. Find the antenna circuit 3. Determine number and type of antenna ## Expected result One or more antennas are designed that correspond with application tradeoffs. ## Actual result Testing has not yielded information useful in deciding (lack of) antenna design. ## Workaround Include several antennas in the switch and antenna design until information leads to a better choice. ## Severity level This is **low priority** because project requirements state no antenna quality.
Michael Schloh von Bennewitz pievienoja etiķeti
enhancement
pirms 4 gadiem
Michael Schloh von Bennewitz pievienoja etiķeti
derivative
pirms 4 gadiem
Michael Schloh von Bennewitz pievienoja etiķeti
help wanted
pirms 4 gadiem

By now several of the original seven antenna designs have been tested and selectively removed. The final design integrates four antenna connections:

  1. Trace (AE1)
  2. Chip (AE5)
  3. U.FL (AE2)
  4. SMA (AE4)
By now several of the original **seven antenna designs** have been tested and selectively removed. The final design integrates four antenna connections: 1. Trace (AE1) 1. Chip (AE5) 1. U.FL (AE2) 1. SMA (AE4)
Pierakstieties, lai pievienotos šai sarunai.
Nav atskaites punktu
Nav atbildīgo
1 dalībnieki
Izpildes termiņš

Izpildes termiņš nav uzstādīts.

Atkarības

Šai problēmai pagaidām nav nevienas atkarības.

Notiek ielāde…
Atcelt
Saglabāt
Vēl nav satura.