Host devices may be powered by the 5V and 3V3 power circuits. In some cases this power supply method is documented and depends on conditions.
Steps to reproduce
Refer to the schematic
Locate power interfaces
Examine connections to host
Expected result
The power supply method when backpowering connected host devices conforms to best practices and host documented conditions.
Actual result
Backpowering is untested and undocumented.
Workaround
A backpowering configuration (indication and current rating) may be written to the EEPROM data structure to build a appropriate device tree at host boot.
Severity level
This is low priority because project requirements do not state a (back) power strategy.
# 5V and 3V3 backpower is untested
## Problem environment
Host devices may be powered by the 5V and 3V3 power circuits. In some cases this power supply method is documented and depends on conditions.
## Steps to reproduce
1. Refer to the schematic
1. Locate power interfaces
1. Examine connections to host
## Expected result
The power supply method when backpowering connected host devices conforms to best practices and host documented conditions.
## Actual result
Backpowering is untested and undocumented.
## Workaround
A backpowering configuration (indication and current rating) may be written to the EEPROM data structure to build a appropriate device tree at host boot.
## Severity level
This is **low priority** because project requirements do not state a (back) power strategy.
5V and 3V3 backpower is untested
Problem environment
Host devices may be powered by the 5V and 3V3 power circuits. In some cases this power supply method is documented and depends on conditions.
Steps to reproduce
Expected result
The power supply method when backpowering connected host devices conforms to best practices and host documented conditions.
Actual result
Backpowering is untested and undocumented.
Workaround
A backpowering configuration (indication and current rating) may be written to the EEPROM data structure to build a appropriate device tree at host boot.
Severity level
This is low priority because project requirements do not state a (back) power strategy.
Partially implemented in
55b3621
to support selective (via JP7) testing.