157 コミット (3ba5b2870f1b3762b3a72d0d9c20cfa354045df3)

作成者 SHA1 メッセージ 日付
  Michael Schloh von Bennewitz 3ba5b2870f Add out of tree footprint module files for inclusion in manufacturing. 4年前
  Michael Schloh von Bennewitz 9702fcfc69 Improve name text of artist signature which was too long before. 4年前
  Michael Schloh von Bennewitz 719e193c1b Add a 45mm large mousebite panel tab to accommodate enclosure hinges. 4年前
  Michael Schloh von Bennewitz 9f370cd029 Annotate J5 and J20 according to their serial protocols in silkscreens. 4年前
  Michael Schloh von Bennewitz 3dfc431d97 Mark the first JTAG SWD debug interface connector in the silkscreen. 4年前
  Michael Schloh von Bennewitz 7d49528ff2 Reflect information from bug reports #129 and #130 pending VNA tests. 4年前
  Michael Schloh von Bennewitz f2ad7f7ead Remove stray user drawing layer of a edge cut guidance horizontal bar. 4年前
  Michael Schloh von Bennewitz f4a7a6cc9f Bump version numbers pending panelisation and prepare to manufacture. 4年前
  Michael Schloh von Bennewitz 4f3db6f44a Correct USB bus power circuit according to reference design and adjust. 4年前
  Michael Schloh von Bennewitz 8eebf51cfb Adjust position of external display connection cutout on board bottom. 4年前
  Michael Schloh von Bennewitz 6040ddcdfa Add holes for hackfield, antenna legend, and correct enclosure hinges. 4年前
  Michael Schloh von Bennewitz 5bf1b6c077 Refine calibration suggestion from 12pF to 15pF indicated by counter. 4年前
  Michael Schloh von Bennewitz c4e91a8557 Update parts list according to recent corrections in schematic capture. 4年前
  Michael Schloh von Bennewitz 98b1e69d93 Correct version number as indicated in silkscreen text. 4年前
  Michael Schloh von Bennewitz 1c8ea4862a Implement design review suggestions to resolve #61 and #62. 4年前
  Michael Schloh von Bennewitz 73a6ed98bc Add a test point to allow LSE crystal output redirection to a MCU pin. 4年前
  Michael Schloh von Bennewitz 95df65933d Resolve #128 by rerouting bus power to PA07 F3 to bus test circuit. 4年前
  Michael Schloh von Bennewitz e14d4526eb Calibrate crystal circuits by trial and error pending spectrum analysis. 4年前
  Michael Schloh von Bennewitz 799c6fe772 Calibrate crystal circuits by trial and error pending spectrum analysis. 4年前
  Michael Schloh von Bennewitz 1f2fe604d8 Connect pads from pogo pin test matrix to GND and 3V3 to future proof. 4年前
  Michael Schloh von Bennewitz afa5216e09 Resolve #122 by removing AE7 and JP10 from the layout, and add a PWR LED. 4年前
  Michael Schloh von Bennewitz d772d2f788 Resolve #83 after tests indicate MLS correctly supplies power from PA09. 4年前
  Michael Schloh von Bennewitz a6fcbdf613 Resolve bug report #118 by replacing 10pF with 7pF load capacitors. 4年前
  Michael Schloh von Bennewitz 8c6be81782 Update generated schematic output to correspond with current design. 4年前
  Michael Schloh von Bennewitz 89c95b975f Bump hardware revision number pending tag for design review. 4年前
  Michael Schloh von Bennewitz 8c114dd4b4 Correct optional PA14_XIN and PA15_XOUT external crystal floating pins. 4年前
  Michael Schloh von Bennewitz 52eec91b20 Correct HSE circuit and remove JP26, add RFSW testpoints and text. 4年前
  Michael Schloh von Bennewitz 7c358ddd46 Resolve #114 by replacing flawed 27 pF value with 2,7 pF throughout. 4年前
  Michael Schloh von Bennewitz 68066fe6a9 Include a portable document format rendition of the schematic. 4年前
  Michael Schloh von Bennewitz b6cc59333c Correct secure element model number to support easy TTN integration. 4年前
  Michael Schloh von Bennewitz 819a415fc9 Modify deprecated secure element model to new ATECC608B throughout. 4年前
  Michael Schloh von Bennewitz f6764b5d5e Add top layer test points to connect with bottom layer solder grid. 4年前
  Michael Schloh von Bennewitz b969424881 Resolve #104 by removing unconnected vias from AE5 pad 1. 4年前
  Michael Schloh von Bennewitz 40a2b218fe Redevelop, correct corners, and add connections to format variants. 4年前
  Michael Schloh von Bennewitz 060584f6bc Complete milestone 'Blank FR4 design' for remaining device formats. 4年前
  Michael Schloh von Bennewitz bb8473ae5a Complete production grade panelisation and foil design for LPKF frames. 4年前
  Michael Schloh von Bennewitz 6697d42f59 Correct misplaced designator text label rotated in the last commit. 4年前
  Michael Schloh von Bennewitz 9a29ebfc09 Resolve #97 by redesigning the QFN-12 footprint used for the U4 RF switch. 4年前
  Michael Schloh von Bennewitz a2b385851b Add handwritten signature decorative text to bottom silkscreen. 4年前
  Michael Schloh von Bennewitz b727e44ef5 Resolve DRC errors and panelise irregular tabs for consistency. 4年前
  Michael Schloh von Bennewitz 62e6e0b06b Regenerate and commit the netlist reflecting the power flag addition. 4年前
  Michael Schloh von Bennewitz 0753ffa445 Resolve a false positive on ERC by adding a power flag to a supply input. 4年前
  Michael Schloh von Bennewitz 73d2e45c06 Improve continuity of the ground plane of the top layer by adding a via. 4年前
  Michael Schloh von Bennewitz dde5e9ffb4 Bump revision pending release to panelisation and imminent fabrication. 4年前
  Michael Schloh von Bennewitz 7c2b89e222 Correct flawed U2 package size and bump revision pending release. 4年前
  Michael Schloh von Bennewitz 3c10b0797f Modify placement of J1 battery power selection jumper to improve access. 4年前
  Michael Schloh von Bennewitz a66f58cfd3 Align placement of resistor at R3 to the existing resistor at R2. 4年前
  Michael Schloh von Bennewitz 55a0f50266 Resolve #71 by replacing the 0402 part with a same brand 0805 part. 4年前
  Michael Schloh von Bennewitz 0d38f32cf8 Reduce length of antenna selection jumper traces to improve signal. 4年前
  Michael Schloh von Bennewitz 6969e8e3f0 Complete partially implemented RF switch power selection jumper. 4年前