#179 The firmware collection is out of order

Открыто
открыта 4 лет назад Michael Schloh von Bennewitz · комментариев: 0
Michael Schloh von Bennewitz прокомментировал 4 лет назад

The firmware collection is out of order

Problem environment

Sendcomm delivers a collection of sample applications with firmware source code.

Steps to reproduce

  1. Compare each project in the firmware collection
  2. Contrast differences in unneeded files
  3. Contrast differences in licensces (dates)
  4. Contrast differences in version numbers
  5. Contrast differences in consistent names

Expected result

All projects in the firmware collection should be consistently in order.

Actual result

It is feared (but not confirmed) that consistency errors cause the firmware collection to be out of order.

Severity level

This is low priority because project requirements do not mandate a level of quality in conditionally providing sample applications.

# The firmware collection is out of order ## Problem environment Sendcomm delivers a collection of sample applications with firmware source code. ## Steps to reproduce 1. Compare each project in the firmware collection 1. Contrast differences in unneeded files 1. Contrast differences in licensces (dates) 1. Contrast differences in version numbers 1. Contrast differences in consistent names ## Expected result All projects in the firmware collection should be consistently in order. ## Actual result It is feared (but not confirmed) that consistency errors cause the firmware collection to be out of order. ## Severity level This is **low priority** because project requirements do not mandate a level of quality in conditionally providing sample applications.
Michael Schloh von Bennewitz добавил(а) метку
help wanted
4 лет назад
Michael Schloh von Bennewitz добавил(а) метку
enhancement
4 лет назад
Michael Schloh von Bennewitz добавил к этапу Postproject catchall 4 лет назад
Michael Schloh von Bennewitz поменял целевой этап с Postproject catchall на Conditional integration of samples 4 лет назад
Michael Schloh von Bennewitz поменял целевой этап с Conditional integration of samples на Postproject catchall 4 лет назад
Войдите, чтобы присоединиться к обсуждению.
Нет этапа
Нет назначенных лиц
1 участников
Срок выполнения

Срок выполнения не установлен.

Зависимости

В настоящее время эта задача не имеет зависимостей.

Загрузка…
Отмена
Сохранить
Пока нет содержимого.