#179 The firmware collection is out of order

Відкрито
4 роки тому відкрито Michael Schloh von Bennewitz · 0 коментарів
Michael Schloh von Bennewitz прокоментував(ла) 4 роки тому

The firmware collection is out of order

Problem environment

Sendcomm delivers a collection of sample applications with firmware source code.

Steps to reproduce

  1. Compare each project in the firmware collection
  2. Contrast differences in unneeded files
  3. Contrast differences in licensces (dates)
  4. Contrast differences in version numbers
  5. Contrast differences in consistent names

Expected result

All projects in the firmware collection should be consistently in order.

Actual result

It is feared (but not confirmed) that consistency errors cause the firmware collection to be out of order.

Severity level

This is low priority because project requirements do not mandate a level of quality in conditionally providing sample applications.

# The firmware collection is out of order ## Problem environment Sendcomm delivers a collection of sample applications with firmware source code. ## Steps to reproduce 1. Compare each project in the firmware collection 1. Contrast differences in unneeded files 1. Contrast differences in licensces (dates) 1. Contrast differences in version numbers 1. Contrast differences in consistent names ## Expected result All projects in the firmware collection should be consistently in order. ## Actual result It is feared (but not confirmed) that consistency errors cause the firmware collection to be out of order. ## Severity level This is **low priority** because project requirements do not mandate a level of quality in conditionally providing sample applications.
Michael Schloh von Bennewitz додано
help wanted
мітку 4 роки тому
Michael Schloh von Bennewitz додано
enhancement
мітку 4 роки тому
Michael Schloh von Bennewitz додав(ла) до Postproject catchall етапу 4 роки тому
Michael Schloh von Bennewitz змінено цільової етап з Postproject catchall на Conditional integration of samples 4 роки тому
Michael Schloh von Bennewitz змінено цільової етап з Conditional integration of samples на Postproject catchall 4 роки тому
Підпишіться щоб приєднатися до обговорення.
Етап відсутній
Немає виконавеця
1 учасників
Дата завершення

Термін виконання не встановлений.

Залежності

Ця проблема в даний час не має залежностей.

Завантаження…
Відмінити
Зберегти
Тут ще немає жодного змісту.