#179 The firmware collection is out of order

Отворено
отворено пре 4 година од Michael Schloh von Bennewitz · 0 коментара

The firmware collection is out of order

Problem environment

Sendcomm delivers a collection of sample applications with firmware source code.

Steps to reproduce

  1. Compare each project in the firmware collection
  2. Contrast differences in unneeded files
  3. Contrast differences in licensces (dates)
  4. Contrast differences in version numbers
  5. Contrast differences in consistent names

Expected result

All projects in the firmware collection should be consistently in order.

Actual result

It is feared (but not confirmed) that consistency errors cause the firmware collection to be out of order.

Severity level

This is low priority because project requirements do not mandate a level of quality in conditionally providing sample applications.

# The firmware collection is out of order ## Problem environment Sendcomm delivers a collection of sample applications with firmware source code. ## Steps to reproduce 1. Compare each project in the firmware collection 1. Contrast differences in unneeded files 1. Contrast differences in licensces (dates) 1. Contrast differences in version numbers 1. Contrast differences in consistent names ## Expected result All projects in the firmware collection should be consistently in order. ## Actual result It is feared (but not confirmed) that consistency errors cause the firmware collection to be out of order. ## Severity level This is **low priority** because project requirements do not mandate a level of quality in conditionally providing sample applications.
Michael Schloh von Bennewitz added the
help wanted
label пре 4 година
Michael Schloh von Bennewitz added the
enhancement
label пре 4 година
Michael Schloh von Bennewitz added this to the Postproject catchall milestone пре 4 година
Michael Schloh von Bennewitz modified the milestone from Postproject catchall to Conditional integration of samples пре 4 година
Michael Schloh von Bennewitz modified the milestone from Conditional integration of samples to Postproject catchall пре 4 година
Пријавите се да се прикључе у овом разговору.
Нема фазе
No Assignees
1 учесника
Due Date

No due date set.

Dependencies

This issue currently doesn't have any dependencies.

Loading…
Откажи
Сачувај
Још нема садржаја.