#104 AE5 pad 1 has unconnected vias

Zamknięty
otworzone 4 lat temu przez Michael Schloh von Bennewitz · 1 komentarzy

AE5 pad 1 has unconnected vias

Problem environment

Antenna connectors are routed appropriately, but if vias are left unconnected it should be corrected.

Steps to reproduce

  1. Refer to the layout
  2. Examine AE5
  3. Search vias

Expected result

All vias are connected according to schematic.

Actual result

Two vias on pad 1 are not connected, and should be removed.

Severity level

This is low priority because the unconnected vias do not impair function.

# AE5 pad 1 has unconnected vias ## Problem environment Antenna connectors are routed appropriately, but if vias are left unconnected it should be corrected. ## Steps to reproduce 1. Refer to the layout 1. Examine AE5 1. Search vias ## Expected result All vias are connected according to schematic. ## Actual result Two vias on pad 1 are not connected, and should be removed. ## Severity level This is **low priority** because the unconnected vias do not impair function.
Michael Schloh von Bennewitz dodano etykietę
bug
4 lat temu
Michael Schloh von Bennewitz dodaje to do kamienia milowego Final schematic and layout design 4 lat temu
Michael Schloh von Bennewitz skomentował(-a) 4 lat temu
Właściciel

Resolved by b969424.

Resolved by b969424.
Zaloguj się, aby dołączyć do tej rozmowy.
Brak kamienia milowego
Brak przypisanych
Uczestnicy 1
Termin realizacji

Brak ustawionego terminu realizacji.

Zależności

To zgłoszenie nie ma w tej chwili żadnych zależności.

Ładowanie…
Anuluj
Zapisz
Nie ma jeszcze treści.