#95 The test plan lacks a regression list

Offen
vor 4 Jahren von Michael Schloh von Bennewitz geöffnet · 0 Kommentare

The test plan lacks a regression list

Problem environment

To keep track of regressions during development, a list of test cases serves to remind the quality assurance engineer.

Steps to reproduce

  1. Navigate to the test plan
  2. Search for regression tests
  3. Refer to the list of regressions

Expected result

A list exists specifying regression tests to define a passing grade.

Actual result

The test plan lacks a list of regressions.

Severity level

This is low priority because project requirements state only limited quality assurance.

# The test plan lacks a regression list ## Problem environment To keep track of regressions during development, a list of test cases serves to remind the quality assurance engineer. ## Steps to reproduce 1. Navigate to the test plan 1. Search for regression tests 1. Refer to the list of regressions ## Expected result A list exists specifying regression tests to define a passing grade. ## Actual result The test plan lacks a list of regressions. ## Severity level This is **low priority** because project requirements state only limited quality assurance.
Michael Schloh von Bennewitz hat diesen Issue vor 4 Jahren zum Target platform regression testing Meilenstein hinzugefügt
Michael Schloh von Bennewitz fügte das
bug
Label vor 4 Jahren hinzu
Anmelden, um an der Diskussion teilzunehmen.
Niemand zuständig
1 Beteiligte
Fällig am

Kein Fälligkeitsdatum gesetzt.

Abhängigkeiten

Dieses Issue hat momentan keine Abhängigkeiten.

Laden…
Abbrechen
Speichern
Hier gibt es bis jetzt noch keinen Inhalt.