#95 The test plan lacks a regression list

Öppen
öppnade 4 år sedan av Michael Schloh von Bennewitz · 0 kommentarer

The test plan lacks a regression list

Problem environment

To keep track of regressions during development, a list of test cases serves to remind the quality assurance engineer.

Steps to reproduce

  1. Navigate to the test plan
  2. Search for regression tests
  3. Refer to the list of regressions

Expected result

A list exists specifying regression tests to define a passing grade.

Actual result

The test plan lacks a list of regressions.

Severity level

This is low priority because project requirements state only limited quality assurance.

# The test plan lacks a regression list ## Problem environment To keep track of regressions during development, a list of test cases serves to remind the quality assurance engineer. ## Steps to reproduce 1. Navigate to the test plan 1. Search for regression tests 1. Refer to the list of regressions ## Expected result A list exists specifying regression tests to define a passing grade. ## Actual result The test plan lacks a list of regressions. ## Severity level This is **low priority** because project requirements state only limited quality assurance.
Michael Schloh von Bennewitz lade till denna till milstolpe Target platform regression testing 4 år sedan
Michael Schloh von Bennewitz added the
bug
label 4 år sedan
Logga in för att delta i denna konversation.
No Assignees
1 Deltagare
Förfallodatum

Inget förfallodatum satt.

Beroenden

This issue currently doesn't have any dependencies.

Laddar…
Avbryt
Spara
Det finns inget innehåll än.