#95 The test plan lacks a regression list

Açık
Michael Schloh von Bennewitz tarafından 4 yıl önce açıldı · 0 yorum

The test plan lacks a regression list

Problem environment

To keep track of regressions during development, a list of test cases serves to remind the quality assurance engineer.

Steps to reproduce

  1. Navigate to the test plan
  2. Search for regression tests
  3. Refer to the list of regressions

Expected result

A list exists specifying regression tests to define a passing grade.

Actual result

The test plan lacks a list of regressions.

Severity level

This is low priority because project requirements state only limited quality assurance.

# The test plan lacks a regression list ## Problem environment To keep track of regressions during development, a list of test cases serves to remind the quality assurance engineer. ## Steps to reproduce 1. Navigate to the test plan 1. Search for regression tests 1. Refer to the list of regressions ## Expected result A list exists specifying regression tests to define a passing grade. ## Actual result The test plan lacks a list of regressions. ## Severity level This is **low priority** because project requirements state only limited quality assurance.
Michael Schloh von Bennewitz 4 yıl önce Target platform regression testing kilometre taşına ekledi
Michael Schloh von Bennewitz 4 yıl önce
bug
etiketini ekledi
Bu konuşmaya katılmak için oturum aç.
Atanan Kişi Yok
1 Katılımcı
Bitiş Tarihi

Bitiş tarihi atanmadı.

Bağımlılıklar

Bu konu henüz bir bağımlılık içermiyor.

Yükleniyor…
İptal
Kaydet
Henüz bir içerik yok.