#95 The test plan lacks a regression list

開啟中
Michael Schloh von Bennewitz4 年之前建立 · 0 條評論

The test plan lacks a regression list

Problem environment

To keep track of regressions during development, a list of test cases serves to remind the quality assurance engineer.

Steps to reproduce

  1. Navigate to the test plan
  2. Search for regression tests
  3. Refer to the list of regressions

Expected result

A list exists specifying regression tests to define a passing grade.

Actual result

The test plan lacks a list of regressions.

Severity level

This is low priority because project requirements state only limited quality assurance.

# The test plan lacks a regression list ## Problem environment To keep track of regressions during development, a list of test cases serves to remind the quality assurance engineer. ## Steps to reproduce 1. Navigate to the test plan 1. Search for regression tests 1. Refer to the list of regressions ## Expected result A list exists specifying regression tests to define a passing grade. ## Actual result The test plan lacks a list of regressions. ## Severity level This is **low priority** because project requirements state only limited quality assurance.
Michael Schloh von Bennewitz 新增至Target platform regression testing 里程碑 4 年之前
Michael Schloh von Bennewitz added the
bug
label 4 年之前
登入 才能加入這對話。
No Assignees
1 參與者
Due Date

No due date set.

Dependencies

This issue currently doesn't have any dependencies.

Loading…
取消
儲存
尚未有任何內容