#95 The test plan lacks a regression list

Открыто
открыта 4 лет назад Michael Schloh von Bennewitz · комментариев: 0
Michael Schloh von Bennewitz прокомментировал 4 лет назад

The test plan lacks a regression list

Problem environment

To keep track of regressions during development, a list of test cases serves to remind the quality assurance engineer.

Steps to reproduce

  1. Navigate to the test plan
  2. Search for regression tests
  3. Refer to the list of regressions

Expected result

A list exists specifying regression tests to define a passing grade.

Actual result

The test plan lacks a list of regressions.

Severity level

This is low priority because project requirements state only limited quality assurance.

# The test plan lacks a regression list ## Problem environment To keep track of regressions during development, a list of test cases serves to remind the quality assurance engineer. ## Steps to reproduce 1. Navigate to the test plan 1. Search for regression tests 1. Refer to the list of regressions ## Expected result A list exists specifying regression tests to define a passing grade. ## Actual result The test plan lacks a list of regressions. ## Severity level This is **low priority** because project requirements state only limited quality assurance.
Michael Schloh von Bennewitz добавил к этапу Target platform regression testing 4 лет назад
Michael Schloh von Bennewitz добавил(а) метку
bug
4 лет назад
Войдите, чтобы присоединиться к обсуждению.
Нет назначенных лиц
1 участников
Срок выполнения

Срок выполнения не установлен.

Зависимости

В настоящее время эта задача не имеет зависимостей.

Загрузка…
Отмена
Сохранить
Пока нет содержимого.